84 cents of every dollar donated goes directly to our work
Home > Construction in the 20th of October Barrio

Projects
Construction in the 20th of October Barrio



Of most urgent need is a building in which to work. All the masses and meetings are currently held outdoors, under the hot sun. The plan is to build a small multipurpose hall.


Besides Sunday masses, the space will be shared with two Missionary Sisters of the Holy Spirit (Divine Word Missionaries) and catechetics.


Other buildings are planned for the future:

a small house with four bedrooms,

a kitchen area,

bathrooms,

and later a larger multi-purpose hall with a capacity for 200 people, at which poin the smaller hall will be converted into a more professional center of traditional medicine.



 
Orbis Books: A Maryknoll Imprint
The World Is My Cloister
Living from the Hermit Within
Following Jesus


© Maryknoll Fathers and Brothers 2010 PO Box 304Maryknoll, NY 10545-0304(888) 627-9566e-Mail Us